One-page takeoffs

A single sheet: the color-coded markup, its legend, and the quantity output from the Excel takeoff.

  • Flooring one-page takeoff sample: Retail store fit-out, 6,986 SF. Areas by finish tag, base and transitions.
    Flooring

    Floor finish takeoff

    Retail store fit-out, 6,986 SF. Areas by finish tag, base and transitions.

  • Plumbing one-page takeoff sample: Commercial fit-out, swim school. Pipe by size, drains, cleanouts and fixtures.
    Plumbing

    Sanitary waste and vent takeoff

    Commercial fit-out, swim school. Pipe by size, drains, cleanouts and fixtures.

  • Electrical one-page takeoff sample: Multifamily renovation, 20 apartments. Devices, wiring, alarms, low voltage.
    Electrical

    Unit electrical takeoff

    Multifamily renovation, 20 apartments. Devices, wiring, alarms, low voltage.

  • HVAC one-page takeoff sample: Discount retail store. Duct by size, air devices, rooftop units.
    HVAC

    Ductwork and equipment takeoff

    Discount retail store. Duct by size, air devices, rooftop units.

Full estimate sets

The complete workbooks, and the marked-up sheets where the job had them.

  • Contract price by tradefrom the workbook
    TradeLaborMaterialContractShare
    Aquatic / Pool Package$112,896$169,345$357,77815.1%
    HVAC$124,416$152,064$349,09014.7%
    Electrical$108,016$149,164$325,49413.8%
    Finishes$131,083$94,922$282,41411.9%
    Plumbing$76,274$124,446$254,84210.8%
    General Requirements$207,876$0$251,01010.6%
    Openings$25,882$63,368$114,1204.8%
    Demolition & Existing Conditions$55,197$15,568$87,0093.7%
    7 more trades$344,97414.6%
    Final construction contract$2,366,731100%

    Shown: the eight largest trades. The workbook carries all fifteen with labor, material, tax, OH&P and contingency.

    General contractorCommercial15 trades

    Commercial fit-out, full GC estimate

    A swim school tenant fit-out priced across fifteen trades, from demolition and the pool package to plumbing, HVAC and electrical. Every line traces to the marked-up sheets and the GC's own 15% OH&P, 5% contingency and 8% material tax.

    Bid as
    General contractor
    Scope
    15 trades, including the aquatic package
    Schedule basis
    24-week general conditions
    Final contract
    $2,366,731
    In the set
    4-tab Excel workbook and 7 marked-up MEP sheets
  • Contract price by tradefrom the workbook
    TradeLaborMaterialContractShare
    Painting & Exterior Finishes$13,334$7,718$26,19412.9%
    Drywall & Insulation$12,532$7,149$24,48112.0%
    Wood Framing & Carpentry$6,782$8,289$19,0309.4%
    Concrete & Earthwork$7,333$6,778$17,7188.7%
    Electrical$5,523$7,382$16,3248.0%
    Plumbing$4,181$7,299$14,5947.2%
    HVAC$3,988$7,024$14,0006.9%
    Flooring & Tile$5,210$5,289$13,2076.5%
    Openings$3,083$6,994$12,8686.3%
    7 more trades$45,02722.1%
    Final construction contract$203,443100%

    Drywall and insulation, paint and exterior finishes, and flooring are three of the largest scopes on this job.

    General contractorResidential16 trades

    Single-family house, full GC estimate

    A 935 SF new house taken off from the architectural and MEP drawings and priced trade by trade: slab, framing, roofing, drywall and insulation, flooring, paint, millwork and MEP.

    Bid as
    General contractor
    Area
    935 SF living, 970 SF slab
    Scope
    16 trades
    Final contract
    $203,443
    In the set
    4-tab Excel workbook
  • Three packages, one jobfrom the workbooks
    ScopeLaborMaterialContract
    Metal FramingMetal Framing package$100,045$54,692$202,982
    DrywallDrywall package$121,388$138,178$345,407
    Tape & FloatDrywall package$50,998$8,910$77,290
    PaintingPainting package$59,905$34,411$123,835
    Combined, three packages$749,514

    Each package carries 18% OH&P, 8% contingency and 8% material tax, set by the client.

    SubcontractorDrywallPaint21,900 SF

    Aircraft hangars, framing, drywall and paint

    Five hangars at 21,900 SF priced as three subcontract packages: metal framing, drywall with tape and float, and painting. Each package has its own scope detail and the client's markups.

    Bid as
    Subcontractor, three packages
    Area
    21,900 SF, 5 hangars
    Combined
    $749,513
    Markups
    18% OH&P, 8% contingency, 8% material tax
    In the set
    3 Excel workbooks, one per package
  • Electrical lighting plan for a retail store with every fixture marked in color and counted in an on-sheet legend
    Line items by division211 lines
    CSI divisionLines
    01 00 00 General Requirements6
    02 00 00 Demolition11
    22 00 00 Plumbing60
    23 00 00 Heating Ventilating And Air Conditioning70
    26 00 00 Electrical64
    Total, every line keyed to a sheet and detail211
    MEPTakeoff, ready to price8 sheets

    Discount retail store, MEP takeoff set

    Demolition, plumbing, HVAC and electrical taken off from the bid set. Every line is keyed to a sheet and detail, color-coded on the drawings, and left unpriced so the contractor drops in their own labor and material rates.

    Scope
    Demolition, plumbing, HVAC, electrical
    Line items
    211 across 5 divisions
    Marked sheets
    8 plans and schedules
    Pricing columns
    Labor, material, unit and total, blank for your rates
    In the set
    Excel takeoff and marked-up sheets

Also estimated

More recent work, by project type. Files stay with the client; ask and we will walk you through how we priced a job like yours.

Project typeBid asScope
Public roof replacement, New HampshireRoofing GCPublic bid, roofing and related trades
Commercial roof restorationsRoofing contractorNew England commercial roofing
University engineering suite renovationGeneral contractor13 trades, including glazing, access control and HVAC
University restroom renovationGeneral contractor10 trades, architectural and MEP, public work
Dessert shop tenant fit-out, 1,406 SFGeneral contractorFull fit-out, 20+ trades
Boba shop fit-out, 1,200 SFGeneral contractor10 trades, demolition through finishes
Big-box retail remodelSubcontractorDivision 05 metals
Aircraft hangars, 21,900 SFSubcontractorMEP package

Tell us what you bid. We will tell you how we would run it.

Send the form and we come back with a scope, a price and a date for your next pursuit.

  • Color-coded markups and an Excel takeoff in 3 business days
  • $199 per project, or $3,499 a month for up to 20
  • Priced on your own OH&P, contingency and tax